Receive a report and asset register that help you understand what was completed and what needs follow-up.

Your report

The PDF summary records the site, visit date, agreed scope and result totals. It identifies failed items and exceptions, including equipment that was inaccessible, deferred or excluded. Where relevant, infrastructure work also references the agreed change and its limitations.

Your asset register

A spreadsheet-friendly CSV can include asset ID, description, location, inspection/test date, result, method or test record reference, relevant readings, tester identifier, proposed next-test date and notes. The exact fields depend on the agreed scope and reporting system.

Test & Tag Report
Example Widgets Ltd (fictional)
Job SAMPLE-0001
Visit 2026-09-15
3Passed
1Failed
1Deferred
1Inaccessible
1Visual only
1Excluded
Sample asset results (fictional)
Asset IDDescriptionLocationStatus
SAMPLE-A001Monitor 24 inchL1 desk 04Completed/pass
SAMPLE-A002IEC power lead 2 mL1 desk 04Completed/pass
SAMPLE-A003Power board 4-outletKitchenCompleted/fail
SAMPLE-A004Network switch 24-portComms cupboardDeferred
SAMPLE-A005Multifunction printerCopy roomInaccessible
SAMPLE-A006Desk fanL1 desk 11Visual inspection only
SAMPLE-A007Wall-mounted heater (hard-wired)Meeting roomExcluded
SAMPLE-A008KettleKitchenCompleted/pass
Fictional example. SAMPLE - NOT A TEST RECORD.

Result statuses

Statuses are explicit and never collapse into "pass". Deferred, inaccessible and excluded items are listed so you can plan follow-up.

Completed/pass
Inspected and tested under the agreed method; no fault found at the time.
Completed/fail
Inspected and/or tested and found faulty. Contact notified to remove the item from use.
Visual inspection only
Inspected visually only. Not presented as a completed electrical test.
Deferred
Not tested in this visit, for example awaiting an approved change window.
Inaccessible
Could not be reached safely or without disturbing locked areas.
Excluded
Outside the agreed scope, for example fixed wiring or hard-wired appliances.

Asset register field guide

asset_id
Stable identifier for the item, matching its label. Kept consistent across visits.
description
What the item is, for example "Monitor 24 inch".
location
Where the item was found on site.
equipment_category
Broad type, used to plan methods and retest recommendations.
inspection_outcome
Result of the visual inspection.
test_method
Test method or test record reference, where tested.
readings
Relevant readings where applicable.
result_status
One of the explicit statuses below. Untested items never show a pass.
next_test_recommendation
Proposed next-test date, based on the agreed equipment and environment.
next_test_reason
Why that retest timing was proposed.
notes
Follow-up actions, fault handling and other remarks.

Keep records useful over time

Consistent asset IDs make repeat visits easier to compare. If your organisation already has an asset register, tell us before the visit so we can agree a mapping approach. Duplicate IDs and replaced equipment need explicit handling. Optional reminders are offered only if you ask for them.

Reports may reveal asset IDs and locations, so we confirm the recipient and deliver them through an agreed secure channel, not a public link. The delivery date is agreed in your quote.

What the records do not claim

A test record reflects equipment at the time of inspection and testing. It is not a guarantee of future safety, an electrical installation certificate or a full inventory of your IT environment. Untested assets are not given a pass result. Retest dates do not replace ongoing checks for damage or changes in use.